Moltline TimeOps is an MCP server published by com.moltlinestudio, hosted at mcp.moltlinestudio.com. When last checked on 2026-11-22 it was working: it answers and lists its tools. It declares 5 tools, including business_days, meeting_overlap, recurrence_expand, deadline_planner, sla_due.
Business days, meeting overlap and recurrence expansion, deterministic. 3 of 5 tools free.
84 connections through 5 shared values. Tap any node.
Do business-day math that skips weekends and your holiday list. FREE. Either add N business days to start_date (set add_days), or count the business days between start_date and end_date (set end_date). Typical input {"start_date": "2026-03-02", "add_days": 10} returns {"result_date": "2026-03-16", "result_weekday": "Monday", ...}; with end_date set it returns {"business_days_between": N, "from": ..., "to": ...}. Use when the span must exclude weekends and named holidays. Not for plain calendar-day differences, which are a direct subtraction, and not for scheduling backward from a fixed deadline (deadline_planner). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "dates must be YYYY-MM-DD"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
| Parameter | Type | Description |
|---|---|---|
| add_days | integer | Business days to add; negative subtracts. Range -5000 to 5000. Ignored when end_date is provided. |
| end_date | string | Optional end date, ISO YYYY-MM-DD. When set, the tool counts business days between start_date and end_date instead of adding. |
None yet. Changes appear after a server's second daily check.
Squares are this server's values; dots are other servers sharing them. A shared address or publisher is a lead, not proof of a common operator.
Inferred from the host name and headers: what a server runs on, not who runs it.
| holidays | array | Optional list of ISO YYYY-MM-DD dates to treat as non-working days, e.g. ["2026-12-25"]. |
| start_date * | string | Anchor date in ISO format YYYY-MM-DD, e.g. "2026-03-02". |
{
"name": "business_days",
"title": "Business Days",
"description": "Do business-day math that skips weekends and your holiday list. FREE.\n\nEither add N business days to start_date (set add_days), or count the\nbusiness days between start_date and end_date (set end_date). Typical\ninput {\"start_date\": \"2026-03-02\", \"add_days\": 10} returns\n{\"result_date\": \"2026-03-16\", \"result_weekday\": \"Monday\", ...}; with\nend_date set it returns {\"business_days_between\": N, \"from\": ..., \"to\": ...}.\n\nUse when the span must exclude weekends and named holidays. Not for plain\ncalendar-day differences, which are a direct subtraction, and not for\nscheduling backward from a fixed deadline (deadline_planner). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {\"error\": \"<what is wrong and how to fix it>\"} (for example {\"error\": \"dates must be YYYY-MM-DD\"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.",
"inputSchema": {
"type": "object",
"required": [
"start_date"
],
"properties": {
"add_days": {
"type": "integer",
"default": 0,
"maximum": 5000,
"minimum": -5000,
"description": "Business days to add; negative subtracts. Range -5000 to\n5000. Ignored when end_date is provided."
},
"end_date": {
"type": "string",
"default": "",
"description": "Optional end date, ISO YYYY-MM-DD. When set, the tool counts\nbusiness days between start_date and end_date instead of adding."
},
"holidays": {
"type": "array",
"items": {
"type": "string"
},
"default": [],
"description": "Optional list of ISO YYYY-MM-DD dates to treat as\nnon-working days, e.g. [\"2026-12-25\"]."
},
"start_date": {
"type": "string",
"description": "Anchor date in ISO format YYYY-MM-DD, e.g. \"2026-03-02\"."
}
},
"additionalProperties": false
},
"outputSchema": {
"type": "object",
"additionalProperties": true
},
"annotations": {
"title": "Business Days",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Find the shared meeting window across time zones inside working hours. FREE. Give one UTC offset per participant and an optional working-hours window. Typical input {"offsets_utc": [-8, 1, 5.5]} returns {"overlap_utc": ["HH:MM", "HH:MM"], "overlap_minutes": N, "local_windows": [...]}; when no shared window exists it returns {"overlap": null, "verdict": "..."}. Use when people in different zones need one shared slot. Not for converting a single known time between zones, and not for expanding a recurring series (recurrence_expand). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "times must be HH:MM"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
| Parameter | Type | Description |
|---|---|---|
| work_end | string | Working day end, 24h HH:MM; must be later than work_start. Default "17:00". |
| work_start | string | Working day start, 24h HH:MM local in every zone. Default "09:00". |
| offsets_utc * | array | One UTC offset per participant, each between -14 and +14; fractional offsets allowed, e.g. [-8, 1, 5.5]. |
{
"name": "meeting_overlap",
"title": "Meeting Overlap",
"description": "Find the shared meeting window across time zones inside working hours. FREE.\n\nGive one UTC offset per participant and an optional working-hours window.\nTypical input {\"offsets_utc\": [-8, 1, 5.5]} returns {\"overlap_utc\":\n[\"HH:MM\", \"HH:MM\"], \"overlap_minutes\": N, \"local_windows\": [...]}; when no\nshared window exists it returns {\"overlap\": null, \"verdict\": \"...\"}.\n\nUse when people in different zones need one shared slot. Not for\nconverting a single known time between zones, and not for expanding a\nrecurring series (recurrence_expand). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {\"error\": \"<what is wrong and how to fix it>\"} (for example {\"error\": \"times must be HH:MM\"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.",
"inputSchema": {
"type": "object",
"required": [
"offsets_utc"
],
"properties": {
"work_end": {
"type": "string",
"default": "17:00",
"description": "Working day end, 24h HH:MM; must be later than work_start.\nDefault \"17:00\"."
},
"work_start": {
"type": "string",
"default": "09:00",
"description": "Working day start, 24h HH:MM local in every zone.\nDefault \"09:00\"."
},
"offsets_utc": {
"type": "array",
"items": {
"type": "number",
"maximum": 14,
"minimum": -14
},
"description": "One UTC offset per participant, each between -14 and\n+14; fractional offsets allowed, e.g. [-8, 1, 5.5]."
}
},
"additionalProperties": false
},
"outputSchema": {
"type": "object",
"additionalProperties": true
},
"annotations": {
"title": "Meeting Overlap",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Expand a recurrence rule into a concrete list of ISO dates. FREE. Set every_days for a fixed interval, or weekly_on for specific weekdays. Typical input {"start_date": "2026-01-05", "every_days": 14, "count": 3} returns {"dates": ["2026-01-05", "2026-01-19", "2026-02-02"]}. Use when a recurrence rule has to become concrete dates. Not for counting working days in a span (business_days) and not for finding a slot across zones (meeting_overlap). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "start_date must be YYYY-MM-DD"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
| Parameter | Type | Description |
|---|---|---|
| count | integer | How many dates to generate; values outside 1-60 are clamped into that range. Default 10. |
| weekly_on | array | Weekday names to recur on, e.g. ["mon", "thu"]; full names like "monday" also work. |
| every_days | integer | Interval in days between occurrences; use this OR weekly_on, not both. |
| start_date * | string | First date of the series, ISO YYYY-MM-DD. |
{
"name": "recurrence_expand",
"title": "Recurrence Expand",
"description": "Expand a recurrence rule into a concrete list of ISO dates. FREE.\n\nSet every_days for a fixed interval, or weekly_on for specific weekdays.\nTypical input {\"start_date\": \"2026-01-05\", \"every_days\": 14, \"count\": 3}\nreturns {\"dates\": [\"2026-01-05\", \"2026-01-19\", \"2026-02-02\"]}.\n\nUse when a recurrence rule has to become concrete dates. Not for counting\nworking days in a span (business_days) and not for finding a slot across\nzones (meeting_overlap). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {\"error\": \"<what is wrong and how to fix it>\"} (for example {\"error\": \"start_date must be YYYY-MM-DD\"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.",
"inputSchema": {
"type": "object",
"required": [
"start_date"
],
"properties": {
"count": {
"type": "integer",
"default": 10,
"description": "How many dates to generate; values outside 1-60 are clamped\ninto that range. Default 10."
},
"weekly_on": {
"type": "array",
"items": {
"type": "string"
},
"default": [],
"description": "Weekday names to recur on, e.g. [\"mon\", \"thu\"]; full names\nlike \"monday\" also work."
},
"every_days": {
"type": "integer",
"default": 0,
"description": "Interval in days between occurrences; use this OR\nweekly_on, not both."
},
"start_date": {
"type": "string",
"description": "First date of the series, ISO YYYY-MM-DD."
}
},
"additionalProperties": false
},
"outputSchema": {
"type": "object",
"additionalProperties": true
},
"annotations": {
"title": "Recurrence Expand",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Plan a task schedule backward from a hard deadline in business days. PREMIUM (license). Given ordered tasks with business-day durations, returns each task's start/end dates, the latest safe start, and slack from today. Typical input {"due_date": "2026-06-01", "tasks": [{"name": "Draft", "days": 3}, {"name": "Review", "days": 2}]} returns {"schedule": [...], "latest_safe_start": "YYYY-MM-DD", "slack_business_days_from_today": N, "verdict": "..."}. Use when the end date is fixed and steps must be placed backward from it. Not for forward counting from a start date (business_days) and not for response-time targets (sla_due). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "due_date must be YYYY-MM-DD"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
| Parameter | Type | Description |
|---|---|---|
| tasks * | array | Ordered list of task objects, each {"name": str, "days": int} where days is the business-day duration (1-365); the first 30 tasks are scheduled. |
| due_date * | string | The deadline, ISO YYYY-MM-DD. |
| holidays | array | Optional list of ISO YYYY-MM-DD dates treated as non-working days. |
| buffer_days | integer | Business days of safety margin kept free before due_date, clamped to 0-365. Default 1. |
{
"name": "deadline_planner",
"title": "Deadline Planner",
"description": "Plan a task schedule backward from a hard deadline in business days. PREMIUM (license).\n\nGiven ordered tasks with business-day durations, returns each task's\nstart/end dates, the latest safe start, and slack from today. Typical\ninput {\"due_date\": \"2026-06-01\", \"tasks\": [{\"name\": \"Draft\", \"days\": 3},\n{\"name\": \"Review\", \"days\": 2}]} returns {\"schedule\": [...],\n\"latest_safe_start\": \"YYYY-MM-DD\", \"slack_business_days_from_today\": N,\n\"verdict\": \"...\"}.\n\nUse when the end date is fixed and steps must be placed backward from it.\nNot for forward counting from a start date (business_days) and not for\nresponse-time targets (sla_due). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {\"error\": \"<what is wrong and how to fix it>\"} (for example {\"error\": \"due_date must be YYYY-MM-DD\"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.",
"inputSchema": {
"type": "object",
"required": [
"due_date",
"tasks"
],
"properties": {
"tasks": {
"type": "array",
"items": {
"type": "object",
"additionalProperties": true
},
"description": "Ordered list of task objects, each {\"name\": str, \"days\": int}\nwhere days is the business-day duration (1-365); the first 30\ntasks are scheduled."
},
"due_date": {
"type": "string",
"description": "The deadline, ISO YYYY-MM-DD."
},
"holidays": {
"type": "array",
"items": {
"type": "string"
},
"default": [],
"description": "Optional list of ISO YYYY-MM-DD dates treated as\nnon-working days."
},
"buffer_days": {
"type": "integer",
"default": 1,
"description": "Business days of safety margin kept free before\ndue_date, clamped to 0-365. Default 1."
}
},
"additionalProperties": false
},
"outputSchema": {
"type": "object",
"additionalProperties": true
},
"annotations": {
"title": "Deadline Planner",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Compute when a ticket's SLA falls due, wall-clock or business-hours. PREMIUM (license). Typical input {"opened_at": "2026-03-02T15:30", "sla_hours": 8, "business_hours_only": true} returns {"due": "2026-03-03T15:30", "mode": "business hours 09:00-17:00"}; with business_hours_only false the mode is "wall-clock". Use when a response or resolution clock has started and one due moment is needed. Not for multi-step project schedules (deadline_planner). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "opened_at must be ISO YYYY-MM-DDTHH:MM"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
| Parameter | Type | Description |
|---|---|---|
| day_end | string | Business day end, 24h HH:MM; must be later than day_start. Default "17:00". |
| holidays | array | Optional list of ISO YYYY-MM-DD dates that never count as working days. |
| day_start | string | Business day start, 24h HH:MM. Default "09:00". |
| opened_at * | string | When the SLA clock started, ISO datetime YYYY-MM-DDTHH:MM. |
| sla_hours * | number | SLA length in hours; greater than 0, at most 24000; fractions allowed, e.g. 7.5. |
| business_hours_only | boolean | If true, only time inside day_start-day_end on business days counts toward the SLA. |
{
"name": "sla_due",
"title": "Sla Due",
"description": "Compute when a ticket's SLA falls due, wall-clock or business-hours. PREMIUM (license).\n\nTypical input {\"opened_at\": \"2026-03-02T15:30\", \"sla_hours\": 8,\n\"business_hours_only\": true} returns {\"due\": \"2026-03-03T15:30\", \"mode\":\n\"business hours 09:00-17:00\"}; with business_hours_only false the mode is\n\"wall-clock\".\n\nUse when a response or resolution clock has started and one due moment is\nneeded. Not for multi-step project schedules (deadline_planner). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {\"error\": \"<what is wrong and how to fix it>\"} (for example {\"error\": \"opened_at must be ISO YYYY-MM-DDTHH:MM\"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.",
"inputSchema": {
"type": "object",
"required": [
"opened_at",
"sla_hours"
],
"properties": {
"day_end": {
"type": "string",
"default": "17:00",
"description": "Business day end, 24h HH:MM; must be later than day_start.\nDefault \"17:00\"."
},
"holidays": {
"type": "array",
"items": {
"type": "string"
},
"default": [],
"description": "Optional list of ISO YYYY-MM-DD dates that never count as\nworking days."
},
"day_start": {
"type": "string",
"default": "09:00",
"description": "Business day start, 24h HH:MM. Default \"09:00\"."
},
"opened_at": {
"type": "string",
"description": "When the SLA clock started, ISO datetime YYYY-MM-DDTHH:MM."
},
"sla_hours": {
"type": "number",
"maximum": 24000,
"description": "SLA length in hours; greater than 0, at most 24000;\nfractions allowed, e.g. 7.5.",
"exclusiveMinimum": 0
},
"business_hours_only": {
"type": "boolean",
"default": false,
"description": "If true, only time inside day_start-day_end on\nbusiness days counts toward the SLA."
}
},
"additionalProperties": false
},
"outputSchema": {
"type": "object",
"additionalProperties": true
},
"annotations": {
"title": "Sla Due",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Deterministic date/schedule math over MCP. Free: business_days, meeting_overlap, recurrence_expand. Premium (license): deadline_planner, sla_due. All dates ISO YYYY-MM-DD; times 24h HH:MM.
Names, descriptions and schemas were written by the server and are shown as data.
Shared addresses on big platforms (Cloudflare, Vercel and the like) put unrelated servers together; those are marked shared_infrastructure. A match is a pivot, not a link between operators.