Pathline Project Planner is an MCP server published by io.github.theluckystrike, hosted at critical-path.zovo.one. When last checked on 2026-11-22 it was working: it answers and lists its tools. It declares 1 tool, including calculate_critical_path.
Project planning tool for critical path calculations.
958 connections through 4 shared values. Tap any node.
Use this when the user wants a critical path calculation, project duration, earliest/latest task starts and finishes, or task slack from explicit durations and dependencies. Accepts one to forty tasks, at most 160 finish-to-start dependencies, and durations with at most three decimal places. Includes parallel critical tasks and a CSV schedule. Does not schedule calendar dates, generate Gantt charts, account for resources or holidays, or infer missing task durations.
| Parameter | Type | Description |
|---|---|---|
| unit | string | A single elapsed-time unit for all task durations, e.g. days. Defaults to days; no business calendar is applied. |
| tasks * | array | Tasks in any order, e.g. [{"id":"A","duration":3},{"id":"B","duration":5,"depends_on":["A"]}]. |
| project | string |
None yet. Changes appear after a server's second daily check.
Squares are this server's values; dots are other servers sharing them. A shared address or publisher is a lead, not proof of a common operator.
Inferred from the host name and headers: what a server runs on, not who runs it.
| Project label, e.g. Website launch. |
{
"name": "calculate_critical_path",
"title": "Calculate critical path",
"description": "Use this when the user wants a critical path calculation, project duration, earliest/latest task starts and finishes, or task slack from explicit durations and dependencies. Accepts one to forty tasks, at most 160 finish-to-start dependencies, and durations with at most three decimal places. Includes parallel critical tasks and a CSV schedule. Does not schedule calendar dates, generate Gantt charts, account for resources or holidays, or infer missing task durations.",
"inputSchema": {
"type": "object",
"$schema": "http://json-schema.org/draft-07/schema#",
"required": [
"tasks"
],
"properties": {
"unit": {
"enum": [
"days",
"hours",
"weeks"
],
"type": "string",
"description": "A single elapsed-time unit for all task durations, e.g. days. Defaults to days; no business calendar is applied."
},
"tasks": {
"type": "array",
"items": {
"type": "object",
"required": [
"id",
"duration"
],
"properties": {
"id": {
"type": "string",
"maxLength": 20,
"minLength": 1,
"description": "Unique dependency ID, e.g. design."
},
"name": {
"type": "string",
"maxLength": 50,
"description": "Task label, e.g. Design mockups. Defaults to its ID."
},
"duration": {
"type": "number",
"maximum": 1000000,
"minimum": 0,
"description": "Elapsed duration in the chosen unit, with at most three decimal places, e.g. 2.5. Zero denotes a milestone."
},
"depends_on": {
"type": "array",
"items": {
"type": "string",
"maxLength": 20,
"minLength": 1,
"description": "Predecessor task ID, e.g. design."
},
"maxItems": 39,
"description": "Finish-to-start predecessor IDs, e.g. [\"design\"]. Omit for a starting task."
}
}
},
"maxItems": 40,
"minItems": 1,
"description": "Tasks in any order, e.g. [{\"id\":\"A\",\"duration\":3},{\"id\":\"B\",\"duration\":5,\"depends_on\":[\"A\"]}]."
},
"project": {
"type": "string",
"maxLength": 80,
"description": "Project label, e.g. Website launch."
}
}
},
"outputSchema": {
"type": "object",
"$schema": "http://json-schema.org/draft-07/schema#",
"required": [
"project",
"unit",
"project_duration",
"task_count",
"critical_tasks",
"one_critical_path",
"notes",
"tasks",
"schedule_preview_only",
"downloads"
],
"properties": {
"unit": {
"type": "string"
},
"notes": {
"type": "array",
"items": {
"type": "string"
}
},
"tasks": {
"type": "array",
"items": {
"type": "object",
"propertyNames": {
"type": "string"
},
"additionalProperties": {}
}
},
"project": {
"type": "string"
},
"downloads": {
"type": "object",
"required": [
"csv"
],
"properties": {
"csv": {
"type": "string"
}
},
"additionalProperties": false
},
"task_count": {
"type": "number"
},
"critical_tasks": {
"type": "array",
"items": {
"type": "string"
}
},
"project_duration": {
"type": "number"
},
"one_critical_path": {
"type": "array",
"items": {
"type": "string"
}
},
"schedule_preview_only": {
"type": "boolean"
}
},
"additionalProperties": false
},
"annotations": {
"title": "Calculate critical path",
"readOnlyHint": true,
"openWorldHint": false,
"idempotentHint": true,
"destructiveHint": false
}
}Compute critical paths for explicitly provided duration/dependency networks. Use elapsed offsets, not calendar scheduling. Explain that resources and holidays are not modeled. Multiple parallel chains can be critical; one displayed chain is illustrative.
Names, descriptions and schemas were written by the server and are shown as data.
Shared addresses on big platforms (Cloudflare, Vercel and the like) put unrelated servers together; those are marked shared_infrastructure. A match is a pivot, not a link between operators.